◀ Manual Sprinkling (Suitable for Small Furnaces):
Use a bell jar (equipped with Φ15–16mm holes) to submerge the Flux 7–10 cm deep into the molten zinc (near the furnace bottom). Stir horizontally for 10–15 minutes until complete reaction. Allow to stand for 10 minutes, then thoroughly remove the dry surface slag. Alternatively, utilize a degassing unit to stir the Flux into the melt, followed by slag removal after degassing.
◀ Inert Gas Injection (Suitable for Large/Automated Production Lines):
Within the recommended temperature range, load the required quantity of flux into the powder injector’s hopper and seal the lid. Introduce nitrogen gas, open the injector valve, and once refiner begins flowing through the iron lance, submerge the lance into the molten zinc. Move the lance horizontally, vertically, or in arcs to ensure uniform distribution, completing injection within the processing time. Withdraw the lance and shut off the nitrogen supply afterward.